Lewisham House

Sustainably repurposing the building into residential use 

The Proposals

Overview

The scheme will deliver 319 high-quality co-living rooms, 10% of which will be fully accessible, alongside a range of shared amenities and communal spaces integrated throughout the building.

The following section provides further details about the proposals, sustainability approach and how we have engaged with the local community to ensure the proposals contribute positively to Lewisham.

CGI images

Design Development

The co-living scheme has been carefully designed to repurpose and modernise the existing 18-storey building, creating a high-quality living environment that integrates seamlessly with its surroundings while bringing a vacant site back into active use.

Unlike alternative proposals that seek to extend the building’s footprint and height, this scheme retains the building massing and existing structure, ensuring a sensitive and sustainable approach that:

  • Prevents overdevelopment while respecting the townscape.

  • Delivers much-needed housing efficiently and quickly.

  • Minimises environmental impact through refurbishment rather than demolition.

  • Retains the memory of the existing building whilst sensitively breathing new life into it.

Concept elevation (click to enlarge)

Existing building (click to enlarge)

The proposals aim to:

Refurbish rather than demolish – Retaining the existing 18-storey structure and concrete panels to the ‘bookend’ staircases, avoiding unnecessary waste, and significantly reducing embodied carbon.

Maintain the current height – Ensuring the development remains in scale with the surrounding area, unlike alternative schemes proposing a 33-storey extension.

Introduce a modernised façade – Enhancing thermal performance, fire safety, and acoustic insulation to meet modern sustainability and safety standards.

Create publicly accessible spaces – Featuring a multi-purpose reception with co-working amenities and a café on the ground floor to bring vibrancy to Molesworth Street.

Deliver a well-integrated scheme – Complementing Lewisham’s evolving town centre and supporting its wider regeneration objectives.

Enhance the public realm – Improving the building’s street presence, creating a more engaging and welcoming environment.

Our Co-Living Proposals

The Lewisham House co-living scheme is designed to provide high-quality, professionally managed accommodation that meets the growing demand for flexible and affordable housing in Lewisham.

Each en-suite studio will range from 18 to 27 square metres, offering efficiently designed living spaces that balance privacy and community. Residents will also have access to shared communal spaces, fostering a sense of community while providing private areas for work and relaxation.

The ground-floor entrance is proposed to be a co-working/café space for both residents and the public to enjoy. This forms the reception area for the scheme, where the reception desk will serve as both a dual-purpose reception desk and a café counter. This reception has been designed with large picture windows to maximise natural light, encouraging the public to enter the space

Key Amenities:

  • Spacious shared kitchens & dining areas – Encouraging social interaction and communal dining.

  • Co-working spaces – Designed for remote working, studying, and quiet focus at ground floor level.

  • Public café – Open to both residents and the wider community.

  • Landscaped external terraces – Providing leisure spaces and hosting events.

Co-living facilities and social spaces (click to enlarge)

‘Layout Cross-Section (click to enlarge)

Addressing Lewisham’s Housing Needs

Lewisham is facing a housing shortage, with demand for affordable and flexible rental accommodation far outpacing supply. The borough currently has:

A significant shortfall in new housing, with fewer than one in three homes needed under the London Plan being built.

A growing private rental sector, with 33,000 households privately renting in Lewisham—more than a quarter of all homes.

An over-reliance on outdated housing options, such as poorly converted HMOs, which often lack modern facilities and professional management.

Our co-living scheme helps address these challenges by:

Providing much-needed housing faster – The scheme can be completed within 3–5 years, bringing new homes to Lewisham quickly.

Releasing HMO’s and reinstating traditional housing for family occupation.

Offering high-quality, well-managed accommodation – Professionally managed co-living spaces ensure safety, security, and convenience.

Supporting Lewisham’s regeneration – Attracting new residents, boosting the local economy, and contributing to a more vibrant community.

Landscaping & External Amenity Space

A key part of the design is to ensure flexible outdoor spaces that enhance health and wellbeing.

Two landscaped zones will be included:

  • First-floor terrace – Featuring terraced seating and relaxation areas, as well as a small amphitheatre for gathering

  • Rooftop garden – Offering amphitheatre-style seating, open event spaces, and outdoor lounges.

1. Amphitheatre
2. Open Space
3. Community table with pergola
4. Flexible seating
5. Integrated planter bench

1. Amphitheatre
2. Open Space
3. Table & bench
4. Step
5. Ramp

Proposed external amenity space (click to enlarge)

Sustainability & Energy Efficiency

The scheme is designed with sustainability at its core, aligning with London’s carbon reduction and climate resilience goals.

By retaining and refurbishing the existing building, the proposal:

  • Minimises embodied carbon – Avoiding the environmental costs of full demolition.

  • Reduces construction waste – Using existing materials instead of rebuilding from scratch.

Key Sustainability Features:

  • BREEAM ‘Excellent’ Target – Achieving top sustainability standards across energy use, materials, and environmental impact.

  • High-Performance Building Envelope – Upgrading insulation and reducing heat loss.

  • Low-Carbon Heating & Renewable Energy – No fossil fuels. Incorporating Air Source Heat Pumps (ASHPs) and photovoltaic (PV) panels.

  • Energy-Efficient Lighting & Appliances – Using LED lighting and modern electrical systems.

  • 392 sqm of external amenity space will be provided - integrating urban greening, climate-adaptive landscaping and increasing biodiversity.

  • Sustainable Drainage Solutions (SuDS) – Managing rainwater runoff and reducing flood risk through incorporation of blue roofs.

  • Habitat structures within amenity terraces – Including Insect Habitats, Bat Boxes and Bird boxes to enhance biodiversity.

Sustainability Measures (click to enlarge)

Transport & Connectivity

Lewisham House will be a car-free development, supporting sustainable transport options.

Up to 242 cycle parking spaces will be provided, promoting active travel.

Excellent transport links – The site, which has the highest PTAL rating of 6B, is 200m from Lewisham Station (DLR & National Rail).

Multiple bus routes available from Molesworth Street, the A20, and Lewisham High Street.

Managed servicing plan – Minimising vehicle movements and reducing congestion.

FAQs

The following section provides responses to frequently asked questions relating to the scheme.

(Click on question to expand)

The site and planning context

Design

Impact on the local area